Bond Lake Village: Visiting Richmond Hill to see our newest development

The first stop in our construction site updates takes us to Richmond Hill and the newest development from Fieldgate Homes, Bond Lake Village. Work has only just begun on site, with crews taking up their tools last Monday. As such, there isn’t a whole lot to show right now, but we’ll be visiting the Bond Lake site regularly over the next few months and will have all the latest progress from on site to share.

Crews got on site on Monday July 18th and got to work on excavating the first of our 45 lots on site.

Foundations have been dug on 15 lots thus far, but there's still a lot of land to clear!

The first day on site was spent excavating, and then the concrete for the footings and the walls were started, which took several days.

On average, it takes a day to pour a wall, and in a week all of the walls on a lot can be finished. So next time we take a picture of the above 4 lots, there will be a lot more than walls there - work is fast and always efficient.

All of this soil will be used as back-fill and once cleared, work will start on excavating and pouring the foundations for lots on this space.

The Bond Lake townhomes, street lighting and roads will all be condominium style. For more information please consult with the Bond Lake Sales Representatives (905-313-1021).

It’s relatively quiet on site at the moment, but talking to Site Super Rui, the coming weeks and months will be hectic to say the least! We’ll be back with another update in the next month or so, in the meantime, check out our full photo album of the Bond Lake site here.